Virginia’s Build Boom Is Here. Is Your Facility Ready for Opening Day?

Written by OP of Virginia | Oct 27, 2026, 3:07:44 PM

What’s under construction across the Commonwealth, and the facility question too many owners leave until the last minute

Drive through Loudoun County, Chesterfield, or Hampton Roads right now and you’ll see the same thing: cranes, steel, and crews racing toward 2027 and 2028 opening dates. Virginia is in the middle of one of the biggest construction cycles in its history, in data centers, hospitals, pharmaceuticals, and advanced manufacturing.

Most of the attention goes to the dollar figures and the job counts. Facility leaders know the harder question sits underneath: who will keep these buildings clean, safe, and running on day one, and when does that plan need to be in place?

Here’s a look at what’s being built, and what facility teams should be thinking about now.

Data centers: Northern Virginia keeps growing

Virginia is one of the top five states for data center construction spending this year, and Loudoun County remains one of the most important data center markets in the country. New buildings keep breaking ground on existing campuses. Skanska alone has signed several new Virginia data center contracts this year, with construction starting in August and October 2026 and completions planned for 2028.

The facility question: A data hall is not an office. Modern data halls generally target ISO Class 8 air cleanliness, and dust and particles affect cooling and equipment reliability. Cleaning there calls for HEPA-filtered equipment, subfloor protocols, documented procedures, and coordination with change management. If your cleaning partner hasn’t been trained for critical environments, the risk lands on your uptime.

Healthcare: new hospitals opening across the state

Virginia’s health systems are building at a pace we haven’t seen in years:

  • Inova is building two new hospitals in Northern Virginia, in Alexandria and Springfield, totaling more than 1.4 million square feet.
  • Sentara is replacing Halifax Regional Hospital in South Boston with a new 42-bed hospital, expected to open in mid-2027.
  • VCU Health is finishing a medical office building and ambulatory surgery center in Chesterfield, expected to open in 2027.
  • Bon Secours has started building Norfolk’s first freestanding emergency department, targeting late 2027.
  • The Commonwealth is building a new Central State Hospital in Petersburg, projected to open in 2027.

The facility question: In healthcare, environmental services is patient safety. Infection prevention protocols, terminal cleaning procedures, and 24/7 staffing all have to be ready before the first patient arrives, not worked out in the first month.

Advanced manufacturing and pharma: cleanrooms and containment

Some of the largest private investments in Virginia history are happening right now:

  • Lego’s $1 billion Chesterfield County factory is targeting completion in January 2027.
  • Eli Lilly’s $5 billion Goochland County plant will include cleanroom and containment design.
  • LS GreenLink’s submarine cable plant in Chesapeake will include what’s expected to be the tallest structure in Virginia.
  • Avio USA broke ground in September on a $500 million rocket motor plant in Pittsylvania County.

The facility question: In regulated and high-precision manufacturing, cleaning is part of the quality system. Validated procedures, documentation, and contamination control are required, and auditors will ask about them.

The handoff nobody plans for

Every one of these projects goes through the same risky moment: the turnover from construction to operations.

The contractor finishes, the punch list closes, and suddenly the owner has a brand-new building and a team that has to keep it in that condition. Construction dust in HVAC systems, finishes that need specific care, and staff who have never worked in the building all show up at once.

The facilities that open smoothly usually have three things in common:

  1. They define cleaning scope early. That means 6 to 12 months before opening, while there’s still time to match specifications to the actual floors, finishes, and equipment.
  2. They plan the post-construction cleaning and the ongoing janitorial program together, so nothing is missed between the final construction clean and the first day of operations.
  3. They choose partners who have trained for the environment, whether that’s a data hall, a patient room, or a cleanroom, rather than adapting a generic office cleaning program.

The bottom line

Virginia’s growth is a huge opportunity for the Commonwealth. For facility leaders, it’s also a deadline. The buildings opening in 2027 and 2028 are making their operational decisions now.

If you’re responsible for a facility opening in the next 18 months, start the janitorial conversation now. It’s much easier to build the right program before move-in than to fix the wrong one after.

In my next issue, I’ll share a 90-day opening-day readiness checklist for new facilities. Follow this newsletter so you don’t miss it, and if you’re working on one of these projects, I’d welcome a conversation. Send me a message here on LinkedIn.

What project in your region are you watching most closely? Tell me in the comments.